Area Cat, a.k.a. Dougal McKitty is a stray who showed up on our porch and adopted us in August.

Having a pet is a bit of a lifestyle change for us, and it has made things interesting on the house-project front. The new kitty is another reason for procrastinating the gaping-holes-in-floor stage of construction. The first time he discovered my basement work area, he managed to get a long strip of duct tape stuck to his hind foot, and promptly panicked and tore all over the house trying to to run away from it. LOL!
In spite of the kitty's help, and some time away visiting family, I managed to get a lot of paint stripped off of the living room beams and doorways.
Here are the beams before I started:

And here they are at various stages of completion. (I can only do an 18 inch long segment at a time, because it's so hard working over my head on a ladder).

This is a more detailed view of a beam with paint stripped off. Unlike the woodwork in the dining room and around the doorways, it hasn't been mangled and never had the original finish scratched off with an angle-grinder. I'm reeeeally hoping I can get away with refreshing the finish without having to sand it down and start from scratch! *crosses fingers* I'm about halfway done with the stripping, which should be the hardest part. :)

Here's more paint-stripping progress in the living room/entryway:
(note drips of yet another kooky paint color that was once on the walls and/or trim)



